Erik
       Schonsett
Photography
          and
                Design

About, Links, News,


Linefield
Linefield
Linefield
Linefield
Linefield
Linefield
Linefield
Linefield
Linefield

Linefield

Lebbeus Woods and Student Team.

type: Instillation

client: The Southern California Institute of Architecture

location: Los Angeles California

budget: $1,200

size: 80,000sf

role: Design and Fabrication Team



LINEFIELD was an instillation designed and installed over three days at the Southern California Institute of Architecture under the direction of Lebbeus Woods.

LINEFIELD responds to the 1/4 mile length of the SCI_Arc building by implimenting a field of 1,000 steel rods dispursed thrughout the length of the freight depot. The rods react to the space by continously shifting the density of the field, altering the way that the building is inhabited.